1

The Penmann team finalises comprehensive HVAC refurbishment for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy stringent hygiene and production criteria. The contract included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://bookmarkhard.com/story20650626/penmann-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story