This task included the supply and installation of the pedestrian footbridge about Point out Freeway 36 in Tauranga, together with piers, abutments, concrete walkway, swales, a 10m footbridge around the east side and other affiliated structural operates. The bridge was a 38.3m metal frame truss with GEOTUB modular 900mm columns https://bookmarkick.com/story13958713/blocked-drains-central-coast-no-further-a-mystery